May 31. After we got back from Japan, we found the remodel in a great stage.
All floors were replaced. Our floors used to squeak so no more squeaky floors.
The whole house was re-wired.
The plumbing is finished until fixtures are brought in.
Kitchen/Living room floors are completely replaced.
The fireplace is framed with columns now
North side kitchen wall is fixed where the wood-burning stove used to be.
Kitchen is ready for sheetrock
Powder bathroom
The staircase will be replaced.
Alex's new bathtub awaits for a its bather.
Alex's bathroom.
Alex's bedroom with new windows.
Old guest room, now office.
A view from office into master bathroom shower area. We took out the linen closet that was in the hallway, framed it in so the shower could be bigger.
Old office that is now Rod's walk-in closet.
Master bedroom.
Master bedroom ceiling and walls on the north side.
This wall was moved about a foot towards my walk-in closet. This wall will have a built-in entertainment/bookcase/cabinet system.
A view from the master bedroom into Rod's walk-in closet (old office)
Master bedroom with new plumbing and tub. All half walls so the bathroom is totally open now.
Master bathroom vanity area. The plumbing was moved into the floors instead of being in the walls where the water sometimes froze in the middle of the winter.
My walk-in closet.
Hallway from master bedroom into Alex's in the end of the hallway.
Upstairs hallway into the staircase.